Ask for the resale certificate, the full reserve study, the current budget and financials, two years of board minutes, the insurance declarations, and any notice of a proposed assessment. Then read them against each other and against the building. Where the paperwork and the building disagree is where the risk sits, and Washington gives you a specific window to act on what you find.

Key Takeaways

  • Under RCW 64.90.640, the resale certificate must be furnished before execution of the contract for sale, or otherwise before conveyance.
  • If you receive it five business days or less before signing, you may cancel before conveyance by giving notice no later than the fifth business day after first receiving it. If you get it fewer than five business days before closing, you may extend closing to no more than five business days after receipt.
  • That cancellation provision was amended in 2026, replacing an older rule that made the contract voidable until the certificate was provided. Confirm which version applies to your transaction.
  • The certificate must include the most current reserve study, not just a statement that one exists, and must disclose anticipated repair or replacement costs reasonably anticipated to exceed 5% of the board-approved annual budget.
  • The association must furnish it within 10 days of a unit owner's request, and may not charge more than $275.

What the resale certificate has to contain

More than most buyers realize, and the statute is specific. RCW 64.90.640 lists twenty-six categories, lettered (a) through (z). The certificate must be signed by an officer or authorized agent of the association, based on the association's books and records and the actual knowledge of the person signing, and any category not provided must be marked "NONE" or "RECORDS UNAVAILABLE." That last requirement is useful on its own: a blank is not an acceptable answer, so a "RECORDS UNAVAILABLE" entry is itself information.

The items that matter most to a buyer:

  • Assessments. Any assessment currently due, any delinquent assessments, and any special assessments already levied but not yet due. Also assessments past due more than 30 days against any unit, and association monetary obligations past due more than 30 days, both current to within 45 days.
  • The 5% item. Any expenditure, or anticipated repair or replacement cost, reasonably anticipated to exceed 5% of the board-approved annual budget.
  • The reserve study itself. The certificate must state whether the association has one under RCW 64.90.545 and 64.90.550, and must include the most current study. If there is no current study, the certificate must carry specific language warning that insufficient reserves may require you to pay a share of major repair costs on demand as a special assessment.
  • Financials. The annual financial statement including the most recent audit report available, the balance sheet and revenue and expense statement if any, and the current operating budget.
  • Insurance. A description of coverage, plus contact information for the association's insurance broker or agent.
  • Legal exposure. Unsatisfied judgments, and the status of any legal actions in which the association is a party or claimant.

What it still doesn't tell you

The certificate flags anticipated spending above the 5% threshold, but it doesn't hand you the engineering report, the contractor bids, or the board's reasoning. And here is the gap that matters most: the statute requires disclosure of assessments already due, delinquent, or levied, plus that 5% anticipated-expenditure item. It does not require disclosure of assessments that have merely been proposed or discussed.

So a capital project the board has been debating for a year, that hasn't been levied and hasn't crossed the 5% anticipation threshold in the association's judgment, can be entirely absent from a certificate that is otherwise complete and accurate. That is not a defect in the certificate. It is the certificate working as written, and it is the reason to read the minutes.

Document What it shows What I look for
Resale certificate Assessments, budget, reserve study, insurance, litigation The 5% item, past-due amounts, open legal actions, any "RECORDS UNAVAILABLE"
Full reserve study Remaining life and funding plan for shared components Roofs, cladding, balconies, windows, elevators, garage, plumbing, electrical
Operating budget and financials Day-to-day costs and reserve contributions Deferred or reduced reserve funding, rising dues, delinquencies
Minutes, last two years What the board is actually dealing with Leaks, claims, contractor disputes, engineering reports, dues debates
Insurance declarations Coverage, limits, deductibles, exclusions Deductible size, what falls to the owner, pending claims
Assessment notices Proposed or approved special assessments Amounts, timing, payment plans, who owes what at closing

How long do you have, and what can you do about it?

This is the part that gets treated as a contract question when it's partly a statutory one.

The certificate must be furnished before execution of any contract for sale of the unit, or otherwise before conveyance. The association must produce it within 10 days of a unit owner's request, and may not charge more than $275. There's no additional charge for electronic documents already available through the association's website or portal, an update within six months of the prior request costs up to $100, and the association can't require the owner to use a third-party account to pay for it or receive it.

On your right to act:

  • Received more than five business days before you sign: no right to cancel the executed contract on that basis. You read it before you committed, which is the point.
  • Received five business days or less before you sign: you may cancel before conveyance, by notice to the seller no later than the fifth business day after you first received it.
  • Received fewer than five business days before closing: you may, before conveyance, extend the closing date to no more than five business days after first receipt.

One timing note worth raising with your broker or attorney. This provision was amended in 2026. The earlier version made the purchase contract voidable by the purchaser until the certificate had been provided, and for five days after, and it also said a unit owner wasn't liable for the association's failure or delay. The current version is the five-business-day cancellation structure above, and that seller-protective sentence is gone. Which version governs a particular transaction depends on effective-date and transition rules, so confirm it rather than assume, especially on an older contract.

The practical takeaway hasn't changed: your best protection is reading the documents before you're bound, not relying on a window afterward.

How do you read the reserve study, budget, and minutes together?

Against each other, because each one alone can mislead you. The reserve study says what the building will need, the budget says what the association is actually setting aside, and the minutes say what the board is worried about right now.

Does the study match the budget?

Look at remaining useful life and the funding plan for roofs, siding and exterior cladding, balconies and decks, windows, elevators, plumbing, electrical, garages, and waterproofing. Then check whether the operating budget funds routine maintenance separately from reserve contributions.

If reserve contributions have been cut or deferred, or the study assumes unusually long component lives, ask in writing before you offer. A building can look immaculate and carry a badly underfunded obligation, and a wide gap between recommended and actual funding is a conversation for before your offer, not after your inspection.

What to hunt for in the minutes

Read for decisions and arguments, not just formal assessments. I flag recurring mentions of:

  • Leaks, envelope investigations, or balcony repairs
  • Elevator failures or repeated service calls
  • Insurance renewal problems or open claims
  • Contractor disputes and engineering reports
  • Delinquency trends and dues-increase discussions

This is where the gap in the certificate gets filled. A project the board has been circling for eighteen months shows up in minutes long before it shows up as a levied assessment, and the minutes are the only place you'll see it.

Insurance, and testing the unit against the building

Confirm what the association's policy covers, what falls to you, and then test the unit itself. Paperwork tells you about the structure; the tour tells you about daily life.

The certificate gives you the broker or agent's contact information. Use it. Confirm the property, liability, and directors-and-officers coverage, and any earthquake or other separately purchased coverage. Then read the deductibles, the exclusions, and which building components the declaration assigns to the unit owner.

Don't assume the master policy covers your interior finishes or personal property. Talk to your own insurer early. Look for pending claims, and ask whether the limits look consistent with the building's age and construction.

On the unit: floor level, proximity to elevators, garages, trash rooms, mechanical equipment, loading areas, rooftop equipment, nightlife, and nearby construction all change how a unit lives. I visit specific units at different times of day, because which direction a unit faces is the factor buyers overlook most and it never shows in a listing. Ask about sound complaints, window or balcony restrictions, parking and storage rights, pet and rental rules, and planned work near your unit.

I check FHA and conventional project approval status early too, because your lender underwrites the building as well as you, and not every Seattle building qualifies. And if accessibility matters to you, I audit the route from curb ramp to unit door and measure against your actual equipment, which is one more reason to read the elevator history in the minutes closely.

FAQ

Which HOA documents should I review before making an offer?

The resale certificate, the complete reserve study, current and prior budgets, recent financial statements, insurance declarations and endorsements, board and owner minutes, and any notice of a proposed or approved assessment. The certificate includes many of these by statute, including the most current reserve study, but the minutes and the engineering reports behind the numbers are what you have to ask for.

Can I cancel a condo purchase after reviewing the resale certificate?

Washington gives you a statutory right in some circumstances. Under RCW 64.90.640 you may cancel before conveyance if you first received the certificate five business days or less before signing, with notice no later than the fifth business day after receipt. If you got it fewer than five business days before closing, you may extend closing instead. That provision was amended in 2026, so confirm which version applies and how it interacts with your contract.

How quickly does the association have to produce the certificate, and what can it charge?

Within 10 days of a unit owner's request, for no more than $275. There's no extra charge for electronic documents already available on the association's website or portal, and an update within six months of the previous request is capped at $100.

How can I tell whether a building is likely to face a special assessment?

Look for a reserve study showing major components near the end of their life, reserve contributions that don't match the funding plan, and minutes mentioning leaks, engineering reports, or contractor disputes. The certificate also discloses expenditures reasonably anticipated to exceed 5% of the annual budget. Nobody can promise an assessment won't come, but those signs tell you the odds.

Does the certificate disclose assessments the board is only considering?

No. The statute reaches assessments currently due, delinquent, or already levied, plus anticipated costs over the 5% threshold. A proposal under discussion that hasn't been levied isn't a required disclosure, which is why the minutes matter.

What does the association's insurance actually cover?

It depends on the policy and the declaration, so read both. The association's coverage generally doesn't extend to your personal property, and some interior finishes may be yours. Check deductibles, exclusions, which components are assigned to unit owners, and pending claims, then talk to your own insurer.

The short version

The certificate is a statutory disclosure with defined contents, a production deadline, a fee cap, and in some circumstances a cancellation right attached. It is also deliberately narrower than the full picture, and the narrowest part is the one about assessments nobody has levied yet.

If you have a building in mind, schedule a consultation and we'll go through the file together before you write an offer. I'd rather tell you a unit isn't worth it than watch you inherit someone else's repair bill.

About Kim Reidy

Kim Reidy is a Senior Broker and Director of Relocation at Pointe3 Real Estate in Seattle who has been helping corporate transferees and individuals find the right neighborhood since 2010. A Certified Negotiation Expert (CNE) and Certified Buyer Agent Expert (CBAE), she's known as Seattle's "neighborhood whisperer."

Pointe3 Real Estate · (206) 237-6391

Equal Housing Opportunity. Kim Reidy is a Broker with Pointe3 Real Estate, licensed in Washington State (DOL license 106408) and regulated by the Washington State Department of Licensing. Statutory references describe RCW 64.90.640 as amended and are general information only, not legal advice. Which version of the statute governs a transaction, and how it interacts with your contract, are legal questions; confirm them with your broker or a Washington real estate attorney.

Share:

All Posts Work With Kim

Ready to Buy or Sell in Seattle?

Kim Reidy is Seattle's neighborhood expert. Let's find your perfect home.

Connect With Kim